20th October 2022
The O2/Millennium Dome is the world’s largest dome built on the Meridian Line of the Greenwich Peninsula.
When converted by O2 to its present usage, Durotan was chosen to supply and install the steel pre-insulated pipe system connecting the heating and chilled water plant to the buildings under the canopy. The pre-insulated steel pipes, which are 300mm in diameter and manufactured following BS EN 253, were installed within budget and programme.
Back to case studies