20th October 2022
The SSE Hydro is Located in Glasgow on the site of the Scottish Exhibition and Conference Centre and is a multi purpose arena. Durotan were chosen to supply and install the steel pre-insulated chilled water and low temperature hot water pipes below the arena bowl between mechanical plant rooms 1 & 2.
The pre-insulated steel pipes which are 200mm & 150mm diameter and manufactured in accordance with BS EN 253, were installed within budget and programme.
Back to case studies