20th October 2022
Durotan have supplied and installed a district heating pipe network for British Gas in Greenock. The system, including civil engineering works, incorporates 7000 metres of pre-insulated steel and flexible PEX pipes laid in streets and walkways, with care and consideration for the residents.
The work was carried out quickly and precisely to an effective traffic management programme, maintaining residential access and reducing our on-site profile to a minimum.
Back to case studies